Skip to content

Compare the voices ​

Each voice wrote three pieces from the same three briefs: a news story, an instructional guide, and a marketing page. The facts are fixed, so the differences you read are the voice. Pick a brief and the voices you want, then switch between openings and full text.

What each control on this page does

Brief
Voices
Show
The brief: A town pool reopens after an eight-month closure. Every voice wrote from the same facts and added none.

Every voice writes a news story from these facts and only these facts. Do not invent additional facts, names, or quotes. You may omit facts, order them freely, and paraphrase quotes down to partial quotes, but nothing here may be contradicted and nothing new may be added. Target length: 350-500 words. The story needs a headline in the voice’s style.

The facts

  • The Alder Creek Aquatic Center reopens Saturday at 9 a.m. after an eight-month closure.
  • It closed January 4 when the building’s original 1987 boiler failed during a cold snap.
  • During the boiler replacement, inspectors found water damage under the pool deck and failing tile in both change rooms, which expanded the project.
  • Total cost: $840,000. The town covered $520,000 from its facility reserve; a provincial community-infrastructure grant covered the remaining $320,000.
  • The original estimate, for the boiler alone, was $210,000.
  • The work: new high-efficiency boiler, rebuilt pool deck, retiled change rooms, new accessible entry ramp into the shallow end (the ramp was added to the project in March).
  • The facility is the only public pool within 45 minutes’ drive.
  • The Alder Creek Otters swim club (94 members) spent the season busing to Milfield, 40 minutes away, for practices; the club estimates it spent $18,000 on transportation.
  • Admission is free all weekend (Saturday and Sunday). Regular hours resume Monday: 6 a.m. to 9 p.m. weekdays, 9 a.m. to 8 p.m. weekends.
  • Annual attendance before the closure: about 61,000 visits a year, in a town of 4,200 people.
  • The new boiler is expected to cut the building’s natural gas use by roughly 30 percent.

Quotes (attribute exactly as given)

  • Mayor Teresa Okafor: “Every month it was closed, I heard about it at the grocery store. This building matters to people in a way a spreadsheet doesn’t capture.”
  • Facility manager Dale Kruse: “The boiler was the emergency, but the deck was the real find. If we’d patched the boiler and walked away, we’d have been closing again within two years for something worse.”
  • Otters head coach Marnie Delorme: “The kids never missed a practice, but their parents put forty thousand kilometers on their cars. Nobody wants to see that bus again.”

Timeline

  • Jan. 4: boiler fails, pool closes
  • February: deck and change-room damage found during boiler work
  • March: council votes to add the accessible ramp to the project
  • June: provincial grant confirmed
  • This Saturday: reopening, free swim weekend

A news story, 6 voices, openings only.

Samples

Plainspoken

Direct, clear, helpful.

359 words

Alder Creek Aquatic Center reopens Saturday after $840,000 repair

The Alder Creek Aquatic Center reopens Saturday at 9 a.m. after an eight-month closure. Admission is free Saturday and Sunday. Regular hours resume Monday: 6 a.m. to 9 p.m. on weekdays, 9 a.m. to 8 p.m. on weekends.

Authoritative

Precise, assured, formal.

319 words

Alder Creek pool reopens Saturday after $840,000 repair

The Alder Creek Aquatic Center reopens Saturday at 9 a.m. after an eight-month closure and an $840,000 repair that grew from a failed boiler into a rebuilt pool deck and change rooms.

Warm

Friendly, kind, relaxed.

360 words

The pool is back, and it’s free all weekend

The pool is back. After eight months behind locked doors, the Alder Creek Aquatic Center opens Saturday at 9 a.m., and nobody pays a dime all weekend.

Thoughtful

Curious, considered, rich.

409 words

The long way to the water

The boiler had been in the basement of the Alder Creek Aquatic Center since 1987, and on January 4, in the middle of a cold snap, it quit. The pool closed the same day. The $210,000 boiler replacement became, the way repairs in old buildings do, a door into the next problem: crews pulling up sections of the pool deck found water damage spreading underneath, and in both change rooms the tile was failing. By February the job had become a rebuilding. By the end it cost $840,000, with $520,000 drawn from the town’s facility reserve and a $320,000 provincial infrastructure grant, confirmed in June, covering the rest.

Energetic

Lively, confident, punchy.

332 words

Eight months and $840,000 later, the pool is back

The Alder Creek Aquatic Center reopens Saturday at 9 a.m. Admission is free all weekend.

Steady

Calm, reassuring, careful.

362 words

The pool reopens Saturday, and it’s free all weekend

The Alder Creek Aquatic Center reopens Saturday at 9 a.m., after eight months closed. Swimming is free on Saturday and Sunday. Regular hours start Monday: 6 a.m. to 9 p.m. on weekdays, and 9 a.m. to 8 p.m. on weekends.

Showing each sample’s first paragraph.