Skip to content

The Watership Content Model

Maintenance

Keeping existing content true as products, prices, and policies change: owners, two dates, what triggers a recheck, and when to withdraw something.

Everyone agrees content should be kept up to date, and almost nobody is assigned to do it. Publishing is cheap, each page looks harmless on the day it goes up, and five years later the wiki has three answers to every question and no way to tell which is current.

That used to be an inconvenience. It matters more now that assistants and enterprise search answer questions by retrieving whatever is there. They don’t know the 2022 pricing page was superseded, and nothing expires it unless someone set that up.

Maintenance is one of the four parts of the Watership Content Model. The guidance here is mostly other people’s practice, credited where I’ve taken it, and the last section lists what exists.

What every kept piece carries

Content that’s meant to stay in use carries four things, wherever your tools let you record them (page properties, front matter, or a spreadsheet):

  • An owner. A team, and a name within it. Ownership works best for a set of pages (a product’s help section, a policy area) and is too fine to keep up page by page. When the person leaves, the team still has the set.
  • A reviewed date. When a person last confirmed it’s still true. Your tools record when a page was last changed, and that’s a different thing: a typo fix updates it and tells you nothing. The reviewed date can be coarse (a quarter is precise enough), and it’s worth showing to readers.
  • A recheck date. When it’s next due for a look.
  • What it depends on. The product version it describes, the price list, the policy, the approved claims it repeats.

Messages at the Self level of the review policy aren’t maintained. They were written for one moment. Your records-retention rules still apply to them, so keep what you’re required to keep. Don’t publish them or reuse them as reference.

How often to look

Each content type in the standard has a refresh line, and that line is the default. A slide deck gets rechecked before each use if it’s more than three months old. A case study is reconfirmed with the customer once a year. A comparison is rerun every six months and whenever either product ships a major version. The content type pages have all of them.

Where a type doesn’t say, or for content the types don’t cover:

LevelRecheck
CheckOnce a year, and whenever something it depends on changes
VerifyEvery quarter for the claims it makes, and at once when a trigger fires

What triggers a recheck

When one of these happens, don’t wait for the calendar. Look at everything that depends on what changed.

  • The product changes in a way a published piece describes.
  • A price or a plan limit changes.
  • A measured result is rerun, or a new one replaces it.
  • A certification is renewed, changes scope, or lapses.
  • A name changes: a product, a feature, the company.
  • A law, a regulation, or a contract term the content relies on changes.

When an owner leaves or changes roles, reassign their sets that week.

A trigger only works if the people who maintain content hear about the change. That means a standing line into wherever changes get announced: the release notes, the pricing committee, the change calendar.

Some signals suggest staleness without proving it: a page nobody visits, a broken link, a support article covering something the documentation doesn’t, a product change with no matching content change. Treat these as leads to look into. A page with no visits might be obsolete, or it might be the one a customer needs once a year when something has gone badly wrong.

Withdraw, don’t only delete

A piece whose claims no longer hold shouldn’t stay up unmarked while someone decides what to do with it. There are three honest states, and GOV.UK’s publishing guidance is the clearest account of them I know:

  • Updated. A new version with a new reviewed date.
  • Withdrawn. It stays where it is, with a notice at the top saying it’s out of date and what replaced it. Use this when people still need to see what was said, or when a notice has to stay on record.
  • Removed. It’s taken down and its address redirects to what replaced it.

Check your retention rules before removing anything. Some content has to be kept even after it stops being true.

When a published piece is wrong

Whoever spots it tells the owner of that set of pages, who corrects or withdraws it. If readers may have acted on it, the person who owns the fact decides who needs to be told. If the error is in an approved claim, the claims register’s list of where that claim is used says which other pieces to open.

A piece that still reads as true but no longer does the job it was written for is a candidate for withdrawal too, whatever its dates say.

Finding what a change affects

Working out what a change affects depends on dependencies recorded before the change. With them, “the Pro plan limit went from 10 to 25 seats” becomes a list of pages to open. Without them, it becomes a search for “10” and a hope.

Three practices make it cheaper:

  • Say a fact once. Keep each approved fact in one place and point to it, instead of retyping it into every page. Structured-content people have taught this for decades. The claims register in the standard works this way for high-risk claims: one row each, with the wording, the evidence, the owner, and the recheck date.
  • Use the exact wording. If every page says “25 seats on the Pro plan” in the approved words, one search finds them all. This stops working across translations, which need their own record.
  • Record retired names. A name that was replaced goes on a list of forms that must not come back, and an automated check flags it in new drafts.

A small review you can run this month

Pick one area: a help centre section, a shared drive folder, a set of sales decks.

  1. List it. One row per piece: title, address, owner if known, date last changed, level.
  2. Sort each piece into keep as is, update, merge into another piece, or withdraw or remove.
  3. Start with the Verify-level pieces, then the ones people use most. Usage numbers, where you have them, show which stale pages are doing damage.
  4. Give every kept piece an owner, a reviewed date, and a recheck date. A piece nobody will own is a candidate for removal.
  5. Withdraw or remove on purpose, with a notice or a redirect.

I can’t tell you what share of your content will turn out to be unused. People quote percentages for this, and I haven’t found one I’d repeat as a general fact.

The time it takes

The arithmetic is worth doing before promising anything. A yearly look at 500 Check-level pages at 15 minutes each is 125 hours, which is about 2.5 hours every week of the year for that alone. A content owner with 2 hours a week can’t do it.

So the review is spread across the owning teams, each looking at its own sets, and the content owner’s job is to make sure it happens. When the hours don’t fit, cut content before cutting the review: fewer pages, each one vouched for.

Tom Johnson’s section on maintaining existing documentation is the most practical account of this I know. Several things on this page are adapted from it: the reviewed date kept separate from the changed date, ownership by set, and working a little maintenance into every sprint so it doesn’t get traded away for new work. He also suggests doing the yearly review as a meeting with the owning team, stepping through the pages together, on the theory that a person is harder to ignore than an automated reminder. He says he hasn’t run one himself.

What exists and what doesn’t

What exists:

  • A refresh line on every content type in the standard.
  • The claims register’s design: each claim with an owner, evidence, and a recheck date, reviewed each quarter. Content Standards describes it, and a spreadsheet with those four columns is enough to start one.
  • A way to list retired names so an automated check flags them, in the Vale starter.

What doesn’t:

  • A tool that reads a repository or a SharePoint site and reports owners, dates, and likely duplicates.
  • Change-impact reports generated from recorded dependencies.
  • Written guidance for SharePoint’s own lifecycle settings.
  • Anything that sends a reminder. GOV.UK’s publishing tool shows its editors, in search results, which pages are past their review date, which is more than this page gives you.