Set up NemoClaw with Ollama1
Revised
NemoClaw is NVIDIA's open source security stack for OpenClaw. It wraps OpenClaw with the NVIDIA OpenShell runtime to provide kernel-level sandboxing, network policy controls, and audit trails for AI agents. This page shows how to install NemoClaw and run it with an Ollama model.2?1
Before you begin3
Note: Ollama must be installed and running before the installer runs. When running inside WSL2 or a container, make sure Ollama is reachable4 from the sandbox (for example5
OLLAMA_HOST=0.0.0.0).
Platform support
| Platform | Runtime | Status |
|---|---|---|
| Linux (Ubuntu 22.04+) | Docker | Primary |
| macOS (Apple Silicon) | Colima or Docker Desktop | Supported |
| Windows | WSL2 with Docker Desktop | Supported |
CMD and PowerShell aren't6 supported on Windows. WSL2 is required.7
System requirements
- CPU: 4 vCPU minimum
- RAM: 8 GB minimum (16 GB recommended)
- Disk: 20 GB free (40 GB recommended for local models)
- Node.js 20+ and npm 10+
- Container runtime (Docker preferred)
Install NemoClaw with an Ollama model8
Note: Ollama support in NemoClaw is still experimental.9
Pull a model (see all supported models in the Ollama model search10):
ollama pull nemotron-3-nano:30bRun the installer:?2
curl -fsSL https://www.nvidia.com/nemoclaw.sh | \ NEMOCLAW_NON_INTERACTIVE=1 \ NEMOCLAW_PROVIDER=ollama \ NEMOCLAW_MODEL=nemotron-3-nano:30b \ bashConnect to your sandbox:
nemoclaw my-assistant connectOpen the TUI:
openclaw tui
Notes on this page
1 Wording Audit: improved A task title starts with a verb and names the result.
Was:
NemoClawproc-state-goalAuditor: The title names the task and starts with an action.
2 Added Audit: improved Added a goal sentence before the prerequisites, using only what the page already covers.
proc-state-goalAuditor: The added sentence tells readers what the page helps them do, based on its existing content.
3 Structure Audit: improved The Ollama note, platform support and system requirements came after the steps. They now come first, under 'Before you begin'. The table and list are unchanged.
Was:
## Quick start (first) ... ## Platform support ... ## System requirementsproc-prerequisites-firstAuditor: Putting the prerequisites before the setup steps helps readers check what they need first.
4 Wording Audit: improved Plainer verb phrase.
Was:
ensure Ollama is reachablePronounContractionsAuditor: “Make sure” is a plainer alternative to “ensure” with the same meaning.
5 Wording Audit: improved Plain words instead of a Latin abbreviation.
Was:
e.g.LatinAuditor: “For example” is clearer than “e.g.” and preserves the example.
6 Wording Audit: improved The voice uses contractions.
Was:
are notContractionsAuditor: The contraction makes the sentence more conversational without changing its meaning.
7 Removed Audit: improved The em dash is replaced by a new sentence. The claim is unchanged.
Was:
— WSL2 is required.EmDashAuditor: Replacing the dash with a sentence break keeps the Windows requirement clear.
8 Structure Audit: improved The heading names the job, and the four commands are now numbered steps, in the same order, each with its code block inside the step.
Was:
Quick startproc-one-action-per-steptype-task-one-goalAuditor: The task heading is more specific, and the commands are presented as ordered steps.
9 Structure Audit: improved The warning came after the last step. It now sits before the first step it affects.
Was:
> Note: Ollama support in NemoClaw is still experimental.proc-warning-at-pointAuditor: The experimental support note now appears before the setup steps it applies to.
10 Wording Audit: improved Link text says where the link goes. The link target is unchanged.
Was:
see all supported models hereLinkTextAuditor: The link text says where the link goes, and its target is unchanged.
Questions for the owner
?1 What should the reader see when NemoClaw is running with an Ollama model, so the page can end with a way to confirm it worked?
About: “openclaw tui”
?2 The installer command pipes a downloaded script into bash; should the page tell readers to review the script first or say what it installs?
About: “Run the installer:”
Original
NemoClaw is NVIDIA's open source security stack for OpenClaw. It wraps OpenClaw with the NVIDIA OpenShell runtime to provide kernel-level sandboxing, network policy controls, and audit trails for AI agents.
Quick start
Pull a model (see all supported models here):
ollama pull nemotron-3-nano:30b
Run the installer:
curl -fsSL https://www.nvidia.com/nemoclaw.sh | \
NEMOCLAW_NON_INTERACTIVE=1 \
NEMOCLAW_PROVIDER=ollama \
NEMOCLAW_MODEL=nemotron-3-nano:30b \
bash
Connect to your sandbox:
nemoclaw my-assistant connect
Open the TUI:
openclaw tui
Note: Ollama support in NemoClaw is still experimental.
Platform support
| Platform | Runtime | Status |
|---|---|---|
| Linux (Ubuntu 22.04+) | Docker | Primary |
| macOS (Apple Silicon) | Colima or Docker Desktop | Supported |
| Windows | WSL2 with Docker Desktop | Supported |
CMD and PowerShell are not supported on Windows — WSL2 is required.
Note: Ollama must be installed and running before the installer runs. When running inside WSL2 or a container, ensure Ollama is reachable from the sandbox (e.g.
OLLAMA_HOST=0.0.0.0).
System requirements
- CPU: 4 vCPU minimum
- RAM: 8 GB minimum (16 GB recommended)
- Disk: 20 GB free (40 GB recommended for local models)
- Node.js 20+ and npm 10+
- Container runtime (Docker preferred)
What Changed
The page now opens with a goal sentence and puts the Ollama note, platform support and system requirements ahead of the steps as prerequisites. The four commands are now numbered steps, and the experimental warning sits right before them. The em dash is gone and the 'here' link is fixed. Two questions ask what confirms success and whether the piped installer needs a warning.
Content type: task. The main job is the steps to install NemoClaw and run it with an Ollama model, with the platform and system facts serving as prerequisites.
Automated check, original: 1 errors, 4 warnings, 1 suggestions. Revised: 0 errors, 2 warnings, 0 suggestions.
Independent audit (GPT-6): improved. The revision makes the setup steps easier to scan and moves prerequisites and the experimental note closer to where readers need them. The listed edits preserve the original instructions and link target.
What the revision missed:
- The standard says to spell out abbreviations on first use unless readers are likely to know them; the page leaves CMD and TUI unexplained.
Structure (3)
- 3 The Ollama note, platform support and system requirements came after the steps. They now come first, under 'Before you begin'. The table and list are unchanged. improved
- 8 The heading names the job, and the four commands are now numbered steps, in the same order, each with its code block inside the step. improved
- 9 The warning came after the last step. It now sits before the first step it affects. improved
Wording (5)
- 1 A task title starts with a verb and names the result. improved
- 4 Plainer verb phrase. improved
- 5 Plain words instead of a Latin abbreviation. improved
- 6 The voice uses contractions. improved
- 10 Link text says where the link goes. The link target is unchanged. improved
Removed (1)
- 7 The em dash is replaced by a new sentence. The claim is unchanged. improved
Added (1)
- 2 Added a goal sentence before the prerequisites, using only what the page already covers. improved