This page shows how to add Ollama to Zed, either through your own Ollama or through ollama.com.2

Before you begin3

Install Zed.

Connect Zed to Ollama4

  1. In Zed, select the star icon in the bottom-right corner.5

  2. Select Configure.6

    Zed star icon in bottom right corner

  3. Under LLM Providers, choose Ollama.

  4. Confirm the Host URL is http://localhost:11434.

  5. Select Connect.7

  6. Once connected, select a model under Ollama.

    Zed model list under Ollama8?1

Connect Zed to ollama.com9

  1. Create an API key on ollama.com.
  2. In Zed, select the star icon.10
  3. Select Configure.11
  4. Under LLM Providers, select Ollama.
  5. Set the API URL to https://ollama.com.

Notes on this page

  1. 1 Wording Audit: improved A task title starts with a verb and names the result.

    Was: Zed

    proc-state-goal

    Auditor: The verb-led title says what the reader can do.

  2. 2 Added Audit: improved Added a goal sentence before the steps, using only what the page already covers.

    proc-state-goal

    Auditor: The opening sentence previews the two connection options covered on the page.

  3. 3 Wording Audit: improved Prerequisites go under a heading that says so.

    Was: Install

    proc-prerequisites-first

    Auditor: The prerequisite has a heading that tells readers what it contains.

  4. 4 Wording Audit: improved The heading now names the job.

    Was: Usage with Ollama

    type-task-one-goal

    Auditor: The heading names the task instead of describing usage broadly.

  5. 5 Wording Audit: improved The step held two actions, so it is now two steps, with select instead of click.

    Was: In Zed, click the star icon in the bottom-right corner, then select Configure.

    SelectVerb proc-one-action-per-step

    Auditor: The first action is separated into its own step and uses a clear action verb.

  6. 6 Wording Audit: improved Second action of the original step 1, now its own step.

    Was: then select Configure

    proc-one-action-per-step

    Auditor: Configure is now a distinct step, which is easier to follow.

  7. 7 Wording Audit: improved The step held two actions, so the second is now its own step, with select instead of click.

    Was: Confirm the Host URL is http://localhost:11434, then click Connect

    SelectVerb proc-one-action-per-step

    Auditor: The Host URL check and Connect action are split into separate steps.

  8. 8 Accuracy Audit: regression The alt text on the model list image repeated the first image's text and described the wrong picture. It now describes the step the image sits under. The images are plain Markdown instead of HTML, with the same files.

    Was: Zed star icon in bottom right corner

    img-alt-required

    Auditor: The revised page leaves the ⟦q1⟧ owner-question marker visible after the image, and changing the image markup also removes the original centered half-width presentation.

  9. 9 Wording Audit: improved The heading now names the job.

    Was: Connecting to ollama.com

    type-task-one-goal

    Auditor: The heading clearly names the ollama.com connection task.

  10. 10 Wording Audit: improved The step held two actions joined by an arrow, so it is now two steps (2 and 3).

    Was: In Zed, open the star icon → Configure

    proc-one-action-per-step ui-go-to-paths

    Auditor: The star icon and Configure actions are separated into distinct steps.

  11. 11 Wording Audit: improved Second action of the original step 2.

    Was: → Configure

    proc-one-action-per-step

    Auditor: Configure is now a distinct step, which is easier to follow.

Questions for the owner

  • ?1 What should the reader see when Zed is connected to Ollama, so the page can end with a way to confirm it worked?

    About: “Once connected, select a model under Ollama”

Original

Install

Install Zed.

Usage with Ollama

  1. In Zed, click the star icon in the bottom-right corner, then select Configure.

Zed star icon in bottom right corner

  1. Under LLM Providers, choose Ollama
  2. Confirm the Host URL is http://localhost:11434, then click Connect
  3. Once connected, select a model under Ollama

Zed star icon in bottom right corner

Connecting to ollama.com

  1. Create an API key on ollama.com
  2. In Zed, open the star icon → Configure
  3. Under LLM Providers, select Ollama
  4. Set the API URL to https://ollama.com

What Changed

The page now has a verb title, a goal sentence and a prerequisite heading. Steps hold one action each, click became select, and the images sit inside the steps they illustrate. The second image's alt text was wrong and is corrected. One question asks what confirms the connection.

Content type: task. The page gives the steps to connect Zed to Ollama.

Automated check, original: 0 errors, 3 warnings, 0 suggestions. Revised: 0 errors, 1 warnings, 0 suggestions.

Independent audit (GPT-6): mixed. The revision makes the steps easier to scan and gives the page clearer headings. It also changes image presentation and leaves a question marker in the page, so it needs cleanup before it is ready.

Regressions:

  • The revision changes the images from centered, half-width HTML to plain Markdown, changing their size and alignment without noting that presentation change in the change log.
  • The ⟦q1⟧ marker appears in the published page text; remove it or resolve it before publication.

What the revision missed:

  • The standard says to spell out abbreviations on first use unless they are familiar to the audience; keeping “LLM Providers” is justified only if that exact UI label is necessary, as the change log notes.
  • The revision does not provide a way to confirm the ollama.com connection worked; the owner question correctly flags this gap, but the marker should not remain in the page.

Wording (9)

  • 1 A task title starts with a verb and names the result. improved
  • 3 Prerequisites go under a heading that says so. improved
  • 4 The heading now names the job. improved
  • 5 The step held two actions, so it is now two steps, with select instead of click. improved
  • 6 Second action of the original step 1, now its own step. improved
  • 7 The step held two actions, so the second is now its own step, with select instead of click. improved
  • 9 The heading now names the job. improved
  • 10 The step held two actions joined by an arrow, so it is now two steps (2 and 3). improved
  • 11 Second action of the original step 2. improved

Accuracy (1)

  • 8 The alt text on the model list image repeated the first image's text and described the wrong picture. It now describes the step the image sits under. The images are plain Markdown instead of HTML, with the same files. regression

Added (1)

  • 2 Added a goal sentence before the steps, using only what the page already covers. improved